Contact information
Beijing Tietop Precision Cleaning Equipment Ltd.,
Tel:010-59770618/9
HP:13801028128
Service:18800006639
E-mail:sales@tietop.com.cn
Beijing Tietop Technology Ltd.,
Tel:010-62965904/5/6
HP:13521690328
Shenzhen Tietop Technology Ltd.,
Tel:0755-23400886/7
HP:13828701957
Service:400-6363-639
Suzhou Tietop Office
HP:18706218009
Tel:0512-62829173/5/6
Service:18706218009
Chengdu Tietop Office
HP:13062308888
Tel:028-85408110
Service:18030401317

Shandong Tietop Office
HP:13552867676
 

Your location:首页 > 英文版 > Application > questionnaire > questionnaire

Application of questionnaire

<
Company:
Address:
Postal Code/zip:
City:
Contact person:
Tel:
Fax:
E-mail:
Cleaning object:
Art and type of goods :
Materials : stainless steel steel stainless steel copper cast iron brass aluminium plastics ceramics other
Largest part
Length(mm):
Width(mm):
Height(mm):
Dia(mm):
Weight(kg):
Smallest part
Length(mm):
Width(mm):
Height(mm):
Dia(mm):
Weight(kg):
Through holes: yes no
Blind holes: yes no
Basket location: In the basket fixtue tilting Blind hole down Vertical rotaton horizontal rotaton Shaking waving
Critical surfaces yes no
Proceeding process or work stage (e.g. milling, grinding, lapping)
Subsequent process or work stage (e.g. painting, assembly, packing)
Contaminants: Oil dust Coolant flux solder paste glue glue grinding paste grinding paste other
Is there a method of measuring cleanliness: yes no
Please specify:
Cleanliness requirements : visual The residue weight Ionic contaminants surface insulation clean audit ension test other
Cleaning process: Established Developing Testing required Unknown
Process needed: clean rinse dry filter Exhaust Waste minimization
Present cleaning media : Solvent Caustic alkaline Acid other
Unaccepatable Process/Media:
Maxium temperature°C for:
Clean(°C):
Dry(°C ):
Flash point(°C ) :
Other requirements:
Will existing baskets/wash jigs be used? yes no
basket size(mm):
Maximum weight of one basket (kg):
How many baskets must be cleaned in one 8 hour shift?:
Process flow:
Type (if known):
Site floor space available(mm):
Mains supply(V/HZ) :
Budget: Preliminary Approved
delivery time:
Send: